Background

 

The main rectangular culvert was built in 2006 by Hod HaSharon municipality. It is the main part of the east of Hod HaSharon main drainage system.

 

Balasha-Jalon provided the general and detailed design, as well as general supervision on site.

Basic Design Data:

Drainage basin

2.5

km2

Max flow

64,000

m3/h

First stage’s length

2

km

Second stage’s length

1.5

km

Depths

4 - 7

m

Inside dimensions

3 * 1.75

m

Concrete elements lengths

2.5

m

Concrete elements weight

17

ton